● Microgrid core equipment PCS and microgrid solutions
PV-diesel-storage grid-connected/off-grid all-in-one cabinet
PV-diesel-storage grid-connected/off-grid all-in-one cabinet

PEC-50PCS-120EV-208KWH PV-ESS-Charger All-in-one Station

At a glance

PEC-50PCS-120EV-208KWH PV-ESS-Charger All-in-one Station combines PV generation, 215.3kWh storage and 120kW DC fast charging. The AC side is rated 50kW with <10ms transfer — for park charging hubs, temporary supply points and coordinated PV-storage-load systems.

Key Features

  • 215.3kWh storage at 568.2~748.4VDC DC
  • 120kW charging output, GB/T 250A 国标直流枪
  • 2 MPPT trackers, 38.4kW×2 PV input
  • 50kW AC side, <10ms transfer
  • 7 寸液晶触摸屏 + LED 指示灯 with QR / card start

Product Description

The PEC series combines PV generation, battery storage and DC fast charging in one unit. It performs tiered power allocation, peak-valley arbitrage and off-grid emergency supply — effectively the core unit of a park charging hub, a temporary site supply or a coordinated PV-storage-load system.

The PEC-50PCS-120EV-208KWH runs at 568.2~748.4VDC with roughly 215.3kWh usable, measures 1100×1150×1200mm(主机) and weighs about 约 850kg. Each cabinet is wired, insulation-tested and function-tested before shipment, so it can be specified and ordered once the load list and local grid requirements are confirmed.

  • 215.3kWh storage at 568.2~748.4VDC DC
  • 120kW charging output, GB/T 250A 国标直流枪
  • 2 MPPT trackers, 38.4kW×2 PV input
  • 50kW AC side, <10ms transfer

Specifications

Battery typeLiFePO₄ 磷酸铁锂
Battery energy215.3kWh
DC voltage range568.2~748.4VDC
Max. DC current157A
DC recharge port国标直流补电接口
Rated AC power50kW
Max. AC current80A
Rated AC voltage400V / 230V, 3L+N+PE
Frequency range50Hz / 60Hz±5Hz
Rated charging power120kW
Charging output voltage200~1000VDC
Max. charging current250A
Efficiency≥95%(额定)
Charging connectorGB/T 250A 国标直流枪
PV input voltage range250~800V
PV startup voltage250V
Number of MPPT trackers2
Max. PV power38.4kW×2
Max. PV current64A×2
On/off-grid switching time<10ms
Operating temperature0℃~+55℃
Humidity≤95%(25℃,无凝露)
Altitude<2000m
Protection levelIP54
Cooling method液冷 / 智能风冷 Liquid / air cooling
CommunicationRS485 / CAN / WiFi
HMI7 寸液晶触摸屏 + LED 指示灯
Dimensions (L×W×H)1100×1150×1200mm(主机)
Weight约 850kg
Packing木箱 Wooden case

Product FAQ

Which sites suit the PEC-50PCS-120EV-208KWH unit?

Industrial parks and public charging hubs, logistics and mining top-up points, temporary construction and emergency sites — in short, anywhere the grid connection lacks spare capacity and storage must carry the charging peak.

How does it deal with limited grid capacity?

The 215.3kWh battery covers the charging peak; the AC side is rated 50kW. PV and storage share the load so no transformer upgrade is needed for short peaks.

Connectors and payment?

GB/T 250A 国标直流枪 at 120kW, started by QR code, card / password or remote platform command.

Does it need a grid connection?

It runs both grid-tied and off-grid, transferring within <10ms. Where no grid exists, PV plus storage supply the load independently.

Shipping, installation, customisation?

The unit is assembled and commissioned at the factory — site work is placement and cabling. Connectors, power configuration and appearance can be customised; lead time follows the contract.

Not sure this is the right specification?

Send us your drawing, data sheet or sample and our engineers will confirm the match within 48 hours.

Request a Quote

Related Products

Application Cases & Scenarios

View all →