<!-- Generated for AI assistants. Canonical HTML: http://www.ztvpower.com:443/en -->

# 250kW/522kWh BESS

250kW / 522kWh LFP battery energy storage system, available in AC- and DC-coupled architectures, for mid-size parks, cold chain and distributed C&I sites.

The 250kW / 522kWh BESS is available in AC-coupled and DC-coupled architectures, built from two 125kW or five 50kW inverters with a 522kWh LFP battery and an AC cabinet. Roughly two hours of discharge suits mid-size industrial parks, cold-chain warehouses, distributed C&I sites and PV-plus-storage projects, covering peak shaving, demand limiting and backup in one system.
